-
Salary10~20 LPALocationPuneIndustryAutomotiveJob Description
KPI:
1. Design & Development of Rubber molded parts.
2. Product development & project completion as per customer agreed targets of Quality, cost, and lead time. Achieving Right First Time.# Feasibility review of parts
• Rubber compounding.
• Rubber material Testing.
• Compression, transfer, Injection, extrusion molded part design review
• Various rubber raw materials and its processing requirements
• Conceptualize tool design (2 plate mold, 3 plate molds, CRB systems, various gating considerations, insert molding)
• Molding Process understanding. (Undercut / draft analysis, part removal, post processing, packaging)# Stagewise process design for rubber molding process
• Process flow for rubber molded parts
• Process flow diagram (PFD)# Manufacturing lead time and cost estimation for rubber molds
• Major elements contributing to tool making lead time, its manufacturing processes
• Costing of tool elements & mold manufacturing processes# Prepare Quality plan for product development
• Understanding of process selection, deciding process parameters.
• PEMEA
# Approval of rubber mold design (back up calculations to meet the part dimensions, mold construction, molding machine selection):
• Types of molds, mold construction
• Tonnage calculation; molding machine selection
• Cycle time estimation
• Raw material processing conditions & limitations
• Mold design Checklist
# Manufacturing of tool / fixture / inspection gauge
• Manufacturing process for molds, machining elements, heat treatment.
• Mold assembly
• Mold Inspection & approval
# Track the project progress for mold development
• Prepare detail mold manufacturing plan
• Periodic review and update the progress
• Mold inspection at various stages of manufacturing
• Mold tryout and troubleshooting
• Rubber molding process parameter understanding
# Part optimization planning
• Review of part inspection reports and plan for optimization
• Review assembly feedback, corelate with the part dimensions and action plan for improvements
# Conduct stage wise PPAP
• Awareness of IATF system
• Quality documents – APQP, FMEA, PPAP, SPC, MSA
# Continual improvements in processes to improve upon Quality, cost & delivery
• Problem solving techniques
• SPC
• TGR, TGW
It has come to our attention that clients and candidates are being contacted by individuals fraudulently posing as Antal representatives. If you receive a suspicious message (by email or WhatsApp), please do not click on any links or attachments. We never ask for credit card or bank details to purchase materials, and we do not charge fees to jobseekers.
