Your publication raises a fundamental question, Jean-François: what responsibility do we entrust to the specialists in continuous improvement, and what responsibility do we retain in the managerial line?
An engineer can provide a method, objectify losses and support a construction site. It cannot, on its own, permanently install practices that management does not take up in its daily operation.
On a site, this is visible quite quickly. The site is producing results, the standards are displayed, the first weeks are encouraging. Then emergencies return, routines become more spaced out and certain deviations become habitual.
It is then necessary to look at what happens after the site has been closed. Who is monitoring the results? Who intervenes when a standard drifts? Does the local manager have the time, skills and authority to act?
The site director commits his credibility in these arbitrations.
Asking teams to resolve the causes while systematically postponing the slots planned to do so ends up making the message less credible.
Management support is measured in decisions: protecting time to analyze a problem, dealing with an obstacle that goes beyond the shop floor and keeping the commitments made to the teams.
Autonomy is built in this framework. It requires support, but also the right to propose, experiment and report that a solution does not work as expected.
My career as a site manager and COO leads me to consider the success of an approach through a simple question: do teams now know how to deal with problems for which they previously depended on the specialist?
This is also a decisive point in the recruitments that I support at Antal International. For a continuous improvement manager, I try to understand what he has made managers capable of doing. For an industrial manager, I examine the way in which he has integrated this responsibility into the management of the site.
Before recruiting a Lean expert, it is useful to clarify the mandate: what problems will he or she need to help solve, with which relays and what commitment from management?
In your factories, who carries the results once the project is completed?